Sign In | Join Free | My udpf.com
China Suzhou orl power engineering co ., ltd logo
Suzhou orl power engineering co ., ltd
Suzhou orl power engineering co ., ltd Specializing in the production boiler unit China suppliers
Active Member

9 Years

Home > CFB Boiler Header >

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

Suzhou orl power engineering co ., ltd
Contact Now

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

Brand Name : ORL Power

Model Number : Customization

Certification : ISO9001/SGS/TUV/ASME/EN

Place of Origin : Zhangjiagang,Jiangsu,China

MOQ : Negotiation

Price : Contact me | Get Latest Price

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 500Ton/Tons per Month

Delivery Time : 50~100 Days

Packaging Details : Iron Frame Package

Name : CFB Boiler Header

Type : Natural Circulation/Once Through

Usage : Industry/Power Station

Structure : Fire/Water Tube

Pressure : High/Low Pressure

Style : Style

Fuel : Coal/Gas/Oil-fired, Water Heat

Pipe : Large Diameter Welded Pipe

Dimension(L*W*H) : Customization

Weight : 10~1000ton

Contact Now

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

CFB Boiler Header Description

CFB Boiler Header, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.

The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.

CFB Boiler Header Performance advantage


The key to the manufacture of the header is the welding of the end cap (or head). When welding, most manufacturers use manual arc welding, because the weld is single-sided welding, the root quality is difficult to guarantee, and because of the huge of welding work, number of repairing times, the production cycle is long which cause the entire production process slow. Our company adopt the advanced production technology, well-equipped instrument and sophisticated technology, and invented a submerged arc welding method during the header and cover welding. The character is: In the submerged arc welding machine head threading mechanism fixed connection welding wire guide, along the wire guide head to set the wire guide hole, the wire lead head has a certain degree of curvature, welding the inner wall, the wire guide head extension Into the inside of the welding. The welding method mainly solves the problem that the existing welding method of the boiler header and the end cap (or the head) has the advantages of low processing efficiency, waste of argon at the time of processing, need to open the groove, have many processes, high processing cost and unsatisfactory welding fabrication.

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

FAQ

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.


Product Tags:

boiler steam header

      

low loss header

      
Best Compact Structure CFB Boiler Header With Large Diameter Welded Pipe wholesale

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Suzhou orl power engineering co ., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)